Projects

Djibouti Free Trade Zone Project

Date:2018-11-16 Source:Overseas Projects
Introduction:Crushing Plant Production Line in Djibouti Free Trade Zone was formally put into operation on March 19, 2018, indicating that the overseas projects of DaRun Group have truly realized diversified operation under the premise of consolidating the advantages of hydraulic engineering.
Djibouti Free Trade Zone is about 10 minutes’ drive from Doraleh Port. After the completion of the project, the cargos unloaded at Doraleh Port can be directly transported to the bonded warehouse in the free trade zone, and they will be transported to other countries after sorted.