Projects

Hainan Sansha Box Culvert Installation Project

Date:2017-04-24 Source:办公室

 It is mainly responsible for the transportation and underwater installation of box culverts on island 3 and outside the island. The total construction capacity of this box culvert is 325 pieces, of which 233 ones are installed underwater.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

工程为位处于海南省三沙市某岛屿的码头沉箱吊装工程。施工船舶及管理人员本着安全第一的原则,重视施工效率,克服现场环境艰苦、高温暴晒、定位难、物资补给不便和水文及气象环境复杂等诸多不利条件圆满完成了施工任务。

沉箱过驳

沉箱安装现场