Projects

Ganyu Port Area 100,000 tons and Waterway Phase I Project of Liangyungang

Date:2017-02-23 Source:Darun

Intruduction: 100,000 tons of waterway and harbor pool dredging. The length of the waterway is 16km. The dredged mud surface elevation is 13.6m.The total amount of dredging is 11 millions m3.