Projects

2X1000MW Ultra-Supercritical Coal-fired Generating Set Project of China Resources Haifeng Power Plant Waterway and Harbor Pool Dredging Project

Date:2017-02-23 Source:Darun

Introduction:100,000-ton waterway and harbor pool dredging.The waterway is 12.5KM in total. The dredged mud surface elevation is 16.2m. The total amount of dredging is 16 million m3.